Week 1 - Derwent

BASE – watch the slab go down. Construction of your home will begin once OJ Pippin Homes has received all the necessary documents from Council stating that the designs comply with building regulations.

2 Photos

Week 2 - Derwent

Week 2 – Two weeks into the building your future home,. This is a very exciting stage of the build, watching the Wall Frame go up. Now you can start to see the size and shape of each of the rooms. 10 weeks to go!

2 Photos

Week 3 - Derwent

In week 3 of the 12 week build we see the roof installation. At OJ Pippin homes you can choose either a tiled roof as shown above or a colorbond styled roof.

3 Photos

Week 4 - Derwent

In Week 4 this home is really starting to take shape, the windows are installed, the bricklayers have completed the bricks and mortar on the outside and the plasters sheets have been delivered.

3 Photos

Week 5 - Derwent

In Week 5 the electrician has finalised all the wiring, all the plaster board has been erected and the plumber has completed the rough in for the bathrooms and kitchen. 7 weeks to go to complete the OJ Pippin Homes 12 week build.

2 Photos

Week 6 - Derwent

Now half way through the OJ Pippin home 12 week building process, all the cabinetry is installed including the kitchen, bathroom vanities, wardrobe and doors. The wet seal has been applied so that next week tiler can complete the bathroom. On the outside all the rubbish and ground leveled.

4 Photos

Week 7 - Derwent

After week 7 the owners of this property can see from the photos provided that the internal painting has started, all the tiling in the bathrooms and kitchen has been completed. The driveway has been concreted and the outdoor alfresco area’s have are prepared for the concrete to be poured.

4 Photos

Week 8 - Derwent

Now that all the internal painting is completed, the floor tiles can be layed and the light & fan fittings installed. Externally the plaster rendering is installed to give a fresh finish on the facade.

4 Photos

Week 10 - Derwent

In week 10 of the 12 week build, internally the site has been totally cleaned from top to bottom, all the dust and grime from the building process is removed and this brand new home is now has carpets. Externally the ground is leveled and top soil is distributed across the property so the turf can be laid.

4 Photos

Week 9 - Derwent

In week 9 all the rubbish and waste is removed so the site can get cleaned. The blinds, dishwasher and air conditioner has been installed as these items and appliances are included in the OJ pippin Full Turn Key House and land inclusions.

5 Photos

Week 11 - Derwent

Only two weeks till hand over to the new owners so the landscapers are busy landscaping and fencing the property.

4 Photos

Week 12 - Derwent

It’s now time to hand over this property to it’s new owners. As you can see from the photo’s OJ Pippin Homes deliver a FULL TURN KEY package, this means there is no more to do or pay, the home is ready to move into.

11 Photos

Building your house in 12 weeks – Week 11 – Fencing and landscaping

Only two weeks till hand over to the new owners so the landscapers are busy landscaping and fencing the property.

FULL TURN KEY

All packages are complete ‘TURN KEY’ packages which means we take care of everything for you from full landscaping and paths to window furnishings and floor coverings. Simply move in and enjoy your new home.

Key features:

Full turnkey package including turfing, fencing and landscaping includes:

· Letterbox, clothesline and concrete pad under line)
· Ceiling fans to all bedrooms and living areas
· Air conditioner unit in living area
· Stainless Steel Dishwasher, Oven, Range hood and hotplates
· 5000 litre water tank
· 6 year structural guarantee
· 6 month defects liability period
· Quality assurance in the construction – warranties and certificates provided

Video Tour of the Germaine 210 – Full turn key House Package

Now you can see first hand the quality and attention to detail which OJ Pippins Homes offer. all hardware and fixtures shown on this video are included in the full turn key package pricing.  For more information call 1800 OJHOME